Scheme Standardization
|
|
|
|
The following charter and standardization committees have been
|
|
approved by the Scheme Strategy Committee. The Strategy Committee was
|
|
formed by attendees of the Scheme Workshop in Pittsburgh, October
|
|
2002. The draft charter and the committee-selection process were
|
|
further confirmed by the attendees of the Scheme Workshop in Boston,
|
|
November 2003.
|
|
|
|
|
|
Strategy Committee:
|
|
Alan Bawden
|
|
William Clinger
|
|
Kent Dybvig
|
|
Matthew Flatt
|
|
Richard Kelsey
|
|
Manuel Serrano
|
|
Michael Sperber
|
|
|
|
January 2004
|
|
|
|
|
|
Charter
|
|
=======
|
|
|
|
Standardization Committees
|
|
--------------------------
|
|
|
|
* Steering Committee
|
|
|
|
The creation of Scheme standards shall be governed by a Steering
|
|
Committee that consists of three members. Its responsibility is to
|
|
ensure that the standardization process continues, and to establish
|
|
processes by which draft standards are reviewed and accepted by
|
|
the Scheme community at large.
|
|
|
|
The Steering Committee must replace members who
|
|
leave. Replacements must be selected within three months, and the
|
|
Steering Committee must announce the replacement to the Scheme
|
|
community at large. The Steering Committee itself shall establish
|
|
procedures for replacing its members.
|
|
|
|
This charter can be amended only by a unanimous vote of the
|
|
Steering Committee.
|
|
|
|
* Standard Editors
|
|
|
|
The creation of Scheme standards documents shall be governed by a
|
|
committee of seven Editors, including Editor-in-Chief. The
|
|
Editor-in-Chief is responsible for producing standardization
|
|
documents. None of the Editors may be a member of the Steering
|
|
Committee.
|
|
|
|
When the Editors have produced a candidate standard, they present
|
|
it to the Steering Committee for review and acceptance. The
|
|
Steering Committee shall make no rule concerning the process by
|
|
which a candidate standard is produced or revised, but Editors are
|
|
encouraged to exploit the Scheme Request for Implementation (SRFI)
|
|
process for gathering opinions and suggestions from the Scheme
|
|
community at large.
|
|
|
|
The Steering Committee must replace Editors who leave. The
|
|
replacements must be selected within three months, and the Steering
|
|
Committee must announce the replacement to the Scheme community at
|
|
large.
|
|
|
|
* Scheme Request for Implementation (SRFI) Editors
|
|
|
|
The Scheme Request for Implementation process shall remain the
|
|
primary vehicle for language design and discussion by the Scheme
|
|
community at large. SRFI standards shall be governed by the SRFI
|
|
Editors, and shall not be governed or endorsed by the Steering
|
|
Committee. Standard Editors are encouraged to draw on the SRFI
|
|
process in developing Scheme standards.
|
|
|
|
|
|
Recommended Timeline
|
|
--------------------
|
|
|
|
The Steering Committee and Editors are ultimately responsible for the
|
|
process of Scheme standardization. Nevertheless, as the intent of this
|
|
charter is to make timely progress towards a standard, the following
|
|
timeline and process suggestions (for a single round of standards) may
|
|
serve as a benchmark for the actual process.
|
|
|
|
* Drafting
|
|
|
|
The Editors should produce a draft standard core Scheme, a draft
|
|
module system, and a draft set of initial libraries within 24
|
|
months of the Editors' establishment.
|
|
|
|
During these 24 months, the Editors are encouraged to produce short
|
|
status reports every 6 months, posted at www.schemers.org. The
|
|
Editors are also encouraged to solicit opinions on specific issues
|
|
concerning the draft. The Editors are further encouraged to record
|
|
electronic discussions and meeting minutes in a publicly readable
|
|
archive.
|
|
|
|
If the Editors require more than 24 months to complete the draft,
|
|
they are encouraged to report this as soon as possible to the
|
|
Steering Committee. If the Editors determine they are unable to
|
|
produce a draft, they should report this to the Steering Committee
|
|
as soon as possible.
|
|
|
|
* Review
|
|
|
|
When the Editors finish the draft standards, they should provide
|
|
the drafts to the Steering Committee, who should in turn publish
|
|
the drafts on schemers.org.
|
|
|
|
After this, the members of the Steering Committee and the scheme
|
|
community at large have 6 months to voice concerns, criticism, and
|
|
suggestions for improving the drafts.
|
|
|
|
The Editors should attempt to respond to each voiced concern,
|
|
detailing a rationale against a concern or indicating the way that
|
|
the drafts will change to address a concern.
|
|
|
|
The editors are encouraged to publish numbered (or otherwise
|
|
identified) intermediate revisions of the report during the review
|
|
period, and announce them on schemers.org.
|
|
|
|
* Finalization
|
|
|
|
After the end of the review period, the Editors should submit new
|
|
drafts within three months. The Steering Committee should then
|
|
choose either to finalize the drafts or to restart the review
|
|
process.
|
|
|
|
Current Steering Committee
|
|
==========================
|
|
|
|
Alan Bawden
|
|
Guy L. Steele
|
|
Mitchell Wand
|
|
|
|
Current Editors
|
|
===============
|
|
|
|
Marc Feeley (Editor in Chief)
|
|
William D. Clinger
|
|
R. Kent Dybvig
|
|
Matthew Flatt
|
|
Richard Kelsey
|
|
Manuel Serrano
|
|
Michael Sperber
|